Dargah Construction Site Photos 2017

Back to project main page

Carved stone columns from India
Installing stone columns and capitals
Completed stone columns from above
Completed stone columns from below
Installing hip corbels, carved by Michael Kothrade
Hip corbels installed and aligned
Corbel detail
Close-up of corbel detail
Welding steel ring in place
Corbels and steel ring
Corbels and steel ring from above
Murshid SAM’s grave and teachings
Assembly of base of roof, with Sufi Invocation
Beginning to assemble the zome
Zome roof mostly completed, skylight ring ready
Completing the zome roof and skylight
Preparing roof structure with slings for crane
Crane begins lifting roof structure
Roof structure being moved to posts and corbels
Interior view as roof structure is lowered into place
17-21
Dargah with roof structure
Timber frame completed
Exposed Douglas fir ceiling surface in the porch overhang (1)
Exposed Douglas fir ceiling surface in the porch overhang (2)
Exposed Douglas fir ceiling surface in the porch overhang (3)
Dargah with porch overhang completed
Exposed Douglas fir ceiling surface application begins on the zome
Carved stone columns from India
01/28 
start stop bwd fwd
17-01
17-02
17-03
17-04
17-05
17-06
17-07
17-08
17-09
17-10
17-11
17-12
17-13
17-14
17-15
17-16
17-17
17-18
17-19
17-20
17-21
17-22
17_23
17_24
17_25
17_26
17_27
17_28
01/28 
start stop bwd fwd

View 2015 photos or 2016 photos




















{besps_c}0|17-20.jpg|Interior view as roof structure is lowered into place|{besps_c}0|17-21.jpg|Final positioning of roof structure|{/besps_c}